Jeff & Vanessa / A life in the making
Quiet Backyard LivingA place in progress.
A life taking shape.
Two places / One Happy Place story

The Chapters / At the Cabin

The rough beginning, the work, the wildlife—and a place we keep learning how to enjoy.

Return to the whole book
Small dark cabin structure under the pine tree in the early days
Chapter 1 · Spring–July 2022

The place we hoped might help us breathe again

In some ways, this story began in July of 2022. In other ways, it started earlier than that, after cancer had already changed the shape of our lives.

3 minute read
Jeff and Vanessa in the early days at the cabin
Chapter 2 · July 2022

The first weekend it was finally ours

We closed on the property over Fourth of July weekend and headed up there that same weekend. Technically, the previous owner was still allowed on the property for another couple of days…

5 minute read
Jeff and Vanessa together in the city before heading back to the cabin life they were building toward
Chapter 3 · Summer 2022

Now it was time to make a plan and get to work

We were still enjoying life back in the city, but we could not wait to get back to the peaceful cabin. That was part of what made this season feel so different. We were not trying to…

3 minute read
Vanessa trying out the Cub Cadet 46 inch deck riding lawn mower at the cabin
Chapter 4 · Later in 2022

We bought a RIDING LAWN MOWER, BABY!

At some point, reality set in. If we were really going to manage this place ourselves, there was no way we were push mowing nearly two acres of property. The thought of it scared the…

4 minute read
Cool spring bonfire day in April 2023 at the cabin using fallen winter branches
Chapter 5 · Spring 2023

The long winter made it feel like spring would never get here

Spring finally got here, and when it did, we were off to the races with excitement and enthusiasm. Honestly, maybe a little too much enthusiasm.

3 minute read
Vanessa relaxing on the swing by the fire ring during the early peaceful cabin days
Chapter 6 · Spring–summer 2023

It was time to put my newly acquired skills to the test

By this point, it was time to stop just talking about systems and actually build them. I had some basic wiring and plumbing knowledge already, so it was not like I was starting…

4 minute read
Metal roof installed, gutters installed, and the new 500 gallon water tank placed beside the cabin
Chapter 7 · Summer 2023

Dreams Start to Become Reality

The dream of having running water had seemed so far away when we first bought the place. I kind of knew from the start that it was not going to be easy and it was definitely not going to…

3 minute read
Vanessa by a fall bonfire at the cabin near the fire ring and swing
Chapter 8 · Fall 2023

We just got it built and now we have to take it apart?

Did I mention this was not a year-round heated house? Yeah, we had just built an entire pressurized water system, and now we were staring down the reality that parts of it could not stay…

4 minute read
Axe and knife throwing world championship event in Tulsa Oklahoma in 2024
Chapter 9 · Spring 2024

Let’s make this cabin more comfortable for longer stays

By 2024, we were ready for something different. Up until then, the cabin had been getting better and better, but it still leaned more toward a short-stay roughing-it setup than a place…

3 minute read
Vanessa using a walking cast and scooter near the cabin after breaking her ankle
Chapter 10 · Summer 2024

Sometimes You Need Friends

With Vanessa a little out of commission when it came to helping carry large things and tackle building projects, we had to adjust. So instead of pushing hard on construction, we started…

3 minute read
Blueberries and early fruit starting to come in at the cabin orchard and berry patch
Chapter 11 · Late summer 2024

Life sure is crazy sometimes, ups and downs, ebbs and flows

It was getting close to fall season at the cabin. By then, Vanessa was healing up pretty well. She was getting around in a walking cast, which felt like a big improvement from where we…

2 minute read
Decorative structure built around the new 500 gallon tank after it was raised up on blocks at the cabin
Chapter 12 · Late summer–fall 2024

Still plenty of time to get some things done!

By the end of August 2024, it felt like maybe we still had enough season left to make a real push. And then one of those lucky breaks came along.

3 minute read
Vanessa outside by the cabin during a later-season bonfire as they stretched out the fall season
Chapter 13 · Late October 2024

Stretching Out the Season

It was quite the year, to say the least. Part of us was ready for the year to be over, and the other part wanted just a little more peaceful cabin time.

2 minute read
The cabin property in winter snow during an early-year check-in before the 2025 season began
Chapter 14 · Winter–spring 2025

Hurry Up Spring!!!

Around the first of the year, we drove up to check on the property, and it looked so peaceful in the snow. Standing there in the quiet, it was hard not to start counting the weeks until…

3 minute read
Vanessa with the new vehicle after truck problems forced a big purchase before cabin season
Chapter 15 · Spring 2025

A Renewed Energy

As we headed back up to our peaceful retreat in late April or early May, something felt different. Maybe it was the weather. Maybe it was the change in seasons. Maybe it was just that…

2 minute read
The weird swing structure at the garden opening before it may someday become a grand entrance
Chapter 16 · June 2025

Let’s Get Some Shizzz Done!

Operation make-the-garden-look-better was officially in full effect. By June of 2025, it felt like there was no time to waste. If we were finally going to start making the outside look…

3 minute read
Vanessa helping with the deck frame build beside the cabin doors during the 2025 deck project
Chapter 17 · June 2025

Let’s Build That Deck, BABY!

I sure wish we had a picture of this adventure. It was a sight to see, and Vanessa was more than a little terrified.

3 minute read
Wider view of the garden and orchard area as the 2025 growing season starts looking established
Chapter 18 · July 2025

Let’s Slow Down and Enjoy What We Built

June had been a productive month. But by around Fourth of July weekend, it hit us that this was right around the time we had closed on the place just a few short years earlier.

3 minute read
Tiki torch and deck-side flower bed detail added during the slower dog days of summer
Chapter 19 · July 2025

Waiting 2 Weeks to Get Back to the Cabin SUCKS

By mid to late July of 2025, we were deep in the dog days of summer. This was not really the time for heavy building. It was just too darn hot.

2 minute read
Green-stained structure area being saved and refreshed during the August 2025 family reunion stretch
Chapter 20 · August 2025

Family Reunion and Maybe a Little Work

It was early to mid August now, and we were back. This is always one of our favorite times of the year, because every August we have our family reunion just a few miles away. It is…

3 minute read
Very well-fed squirrel perched on the deck rail during the late summer wildlife-heavy stretch
Chapter 21 · August 2025

Some of Us Are Getting FAT and Some of Us Are Working HARD

Before you get mad at me for the title, let’s clarify. It is not Vanessa getting fat.

2 minute read
Jeff spraying the storage building exterior with the wrong paint color during the September 2025 push
Chapter 22 · September 2025

Saving the Storage Shed? Thingy? Or Whatever It Becomes...

It was September of 2025 now, and the days were getting shorter. Which also meant our days of being up there were starting to run short too.

3 minute read
Guinea hens stealing snacks in the yard during the October 2025 fall wrap-up stretch
Chapter 23 · October 2025

Reflection & Wrapping Up the Season

By October of 2025, it was starting to get chilly. I mean, we were in Michigan, so nobody should be too surprised.

3 minute read
Jeff cutting up a fallen branch near the road during the first spring cleanup trip of 2026
Chapter 25 · April 2026

Spring Is in the Air

We were more than ready to get back to the cabin. But this crazy Michigan weather was doing what it always does, seventy degrees and sunny one day, then thirty degrees and freezing rain…

3 minute read
Fruit Cocktail tree tag and young tree picked out for the cabin orchard in spring 2026
Chapter 26 · April 2026

Let’s Plant Some More Fruit Trees

It was mid April, and we found another chilly but dry and decent day. So I said, “Vanessa, let’s go pick up a couple more fruit trees and plant them at the cabin.”

2 minute read
Cleared walking path through the woods toward the water during the first full 2026 cabin opening stretch
Chapter 27 · Late April–early May 2026

It’s Time, 2026 Cabin Opening Here We Go!

By late April and early May, the weather was finally giving us multiple decent days in a row. So it was time to take advantage of it.

3 minute read
Hummingbird returning to the feeder during the late May 2026 cabin trip
Chapter 28 · Mid–late May 2026

Guess Who’s Back?

Here we are in mid to late May, and the days are finally getting longer and warmer. It is still a little chaotic this time of year, hot one minute, cold the next, but then we got lucky…

5 minute read
Finished wooden steps leading up to the green storage shed at the cabin in June 2026
Chapter 29 · June 2026

Success & Frustration

It is June now, and we have work to do. We have been working our tails off getting outdoor projects done, but now it is time to get back to the inside of the cabin.

4 minute read